Eversource is planning to conduct maintenance work in its right of way on various streets in Waltham
Posted on: July 14, 2022 - 3:22pm
Eversource is planning to conduct maintenance work in its right of way (power line corridor) located in Waltham. The work is expected to kick off in mid-June and will continue through the fall of 2022. The work involves replacing wooden structures with steel structures. See below for affected streets and more attached:
- Waltham: Smith Street, Trapelo Road, Loretta Road, Silver Hill Lane, Wyman Street, Winter Street, 5th Avenue, Silver Hill Lane, Tracer Lane, Lincoln Street, Totten Pond Road
Attachment | Size |
---|---|
lexington-waltham_row.pdf | 58.91 KB |