Cedarwood SSO Mitigation Project:

CLICK HERE to see a full plan depiction of the homes in the Cedarwood neighborhood in the vicinity of the sewer project & use the following guidelines below:

  • Properties that are colored “Green” on the plan are properties on which the sewer service lateral will be replaced.
  • Properties that are colored “Blue” on the plan are properties on which the sewer lateral is to be inspected for a determination of replacement.
  • Streets that are shaded in "Orange / Rust" on the plan are scheduled to be resurfaced with new pavement.
  • CLICK HERE to see a full plan of the West End Construction.

This map was presented at the neighborhood meeting on Monday evening (4/27/15) at Banks School.

*PLEASE MAKE NOTE:

The white powder pellets being applied for dust control as part of the project is Calcium Chloride. This product is widely used for deicing in the winter and on construction projects for dust control. With respect to the health and safety of your children and your pets, walking through a treated area should NOT be hazardous to them, however, please DO NOT allow your children or your pets to consume this material.

------------------------------------------------------------------------------------------------------------------------------------------

Cedarwood Project Schedule Update:

Updated: 10/05/16

D’Allessandro Corp. is working on punch list items and cleanup of the project area.  The City is pursuing the resurfacing of Caldwell Road, Milton Street, Tavern Road, and a portion of Stow Street.